Jump to content

Engineering Projects/Igloo/Howard Community College/Fall2012/p1-502-btd

From Wikiversity

Electronic Sections Expected

[edit | edit source]

Problem Statement

[edit | edit source]

To come up with the next steps of building a full scale igloo.

Team Members

[edit | edit source]

Brown
Deanobijekwu
Thai

Summary

[edit | edit source]

We began by reading over the work done by the first group on this project. They made some considerable progress on the math associated, so we started reading that to learn it ourselves. Once we had figured it all out, we cleared up the math involved in calculating the size of blocks in an igloo. Along with this, we drew up a table with all the projected sizes of the blocks necessary in construction We also researched some alternative methods of constructing an igloo.

Poster

[edit | edit source]
Add caption here

First Week

[edit | edit source]

Our goals is to start the process of building a full scale igloo. We picked up the math tutorial from previous team and calculated the number of blocks needed for every every layer of IglooTutorial. We discussed the material to use for the igloo but its undecided. We decided to build the igloo in middle of campus, front of the food court.

Second Week Task

[edit | edit source]

Calculate the dimensions of every block base on the math tutorial.

Second Week

[edit | edit source]
Layer (Height) Radius (ft) Circumference (r x 2pi) # of Blocks Layer Angles (Degrees)
1 3.44 21.61 14.4 16.21
2 3.18 19.98 13.34 32.17
3 2.90 18.22 12.17 45.97
4 2.60 16.33 10.89 56.98
5 2.25 14.14 9.43 65.77
6 1.84 11.56 7.7 72.95
7 1.40 8.80 5.44 78.69
8 0 0 1 pentagon piece Undefined

Thrid Week

[edit | edit source]

Interior angle = ((number of blocks - 2) x 180 )/number of blocks

Layer (Height) Number of sides/blocks Interior angle (Degrees) Angle should be cut (degrees)
1 14 154.3 25.7
2 13 152.3 27.7
3 12 150 30
4 11 147.3 32.7
5 9 140 40
6 8 135 45
7 5 108 72
8 5 108

Material List

[edit | edit source]
1. Igloo construction book
2. Calculator

We worked a combined 20 hours on this project

Next Steps

[edit | edit source]

The next group will probably want to pray for snow. At this point, everything is in place. All we need is some snow to actually build with. Maybe purchase a snow saw just in case.